3f
Software Planner 2006
V. 4.00 (October 25, 2005) Available for:
Server download and Hosting |
|
Application
Improvements |
|
1. |
Test Management
- Test cases can now be printed as an
overview or in detail. If a test case
is printed in detail it can be used as
"paper copy" and
space for the test results have been
provided.
- Added a new button Save & New when
entering test questions so that the
test question list is not reloaded
each time a question
is entered. |
|
2. |
Test results and test history can now be printed. |
|
3. |
Popup calendar has been changed to an
inline DHTML calendar. The advantage
is that it loads much faster than the
popup calendar. |
|
4. |
Start, stopping and pausing time
tracking is much faster about 0.50
Sec.. No more annoying refreshes. |
|
5. |
New icon added in the tool bar that
let you stop task (second level) time
tracking without going to the Today
Page. |
|
6. |
In the Errors and Changes section the
system now records who entered an item
and when as well as who last changed
an item and when. The extra
information has been added to XML
Export. |
|
7. |
The program offer different skins
making the application more colorful. |
|
8. |
Added % +/- column in both project
overview reports |
|
9. |
The application has been made more
"resizable" and can now be run on a
monitor with 800 X 600 Pixel
resolution and higher. |
|
10. |
The search capabilities have been
enhanced so that the system now can
search across all projects that a
resource have access to. The resource
can choose in what area's of the
program to search as well. |
|
11. |
Comment system improved.
11.1 When a task or error and
change comment is entered you can now
choose who the comment will be send to
(via email).
11.2 New comment report, view
all comment entered in the system
grouped by task and errors and changes
items. Further group by whom
the the comment was intended for or
who entered it.
11.3 Comment report can be
printed. |
|
12. |
Added the ability to load other pages
from i.e. content management systems
within the 3f Software Planner work
space by customizing the menu. (XML
Menu generator tool to be released in
early November 2005 together with
updated SDK) |
|
13. |
Resources can now be assigned to the
task while the task is being created.
The system now gives two possibilities
to assign a resource to a task, either
in the task list or in the Gantt
diagram (If you have the optional
Gantt diagram and Planning Module) |
|
14. |
My Assigned Tasks is a new page where
all the tasks, from all projects,
assigned to the resource working with
the system are listed. |
|
15. |
New navigation in the errors and
changes section. You can now navigate
through all errors and change items
without going back to the list view.
This is handy if you are working as a
project manager and you want to review
the errors and changes. You can, when
you navigate from one item to another
choose whether you want to save it or
not i.e. if you have made a change. |
|
|
|
|
Application
Changes |
|
1. |
Navigational structure. The primary
navigation tool is now a tree view as
oppose to pull down menu's. The result
is a cleaner working area and much
easier application navigation. |
|
2. |
Gantt diagram and Planning Module now
have enterprise and project resources
that can be scheduled in the Gantt
diagram. |
|
3. |
Project Management Page renamed to
Task Remaining Hours. When loaded,
tasks are now sorted by task ID |
|
4. |
The help index look and feel has been
updated adhere to the new 3f Software
Planner look and feel. |
|
5. |
The icon identifying if a document has
been uploaded has been updated so that
it more clearly identifies where
documents have been uploaded. |
|
6. |
The project number now have a more
prominent exposure though out
the application. This is especially
helpful for companies where projects
are referenced to through their
project numbers. |
|
7. |
Starting of Project and Non Project
tasks time tracking has been
separated. Project tasks are accessed
from the tree view under the project
to which they belong. |
|
8. |
Moved Version History from the project
report section to the general project
section. |
|
9. |
Project grouping has been moved from
the Enterprise Menu to the Project
Menu in the tree view. |
|
10. |
Project and Enterprise resources
(requires Gantt diagram and Planning
module) now have a more prominent
place in the project node. |
|
11. |
Several icon's have been updated to
better reflect the usage. |
|
12. |
All un resolved errors and change
items are now loaded each time you go
to Errors and Changes without having
to press "Retrieve". |
|
13. |
When an error and change item is set
to resolved, the hours estimated
(entered) are no longer set to 0 any
more. |
|
|
|
|
Bug
Fixes |
|
1. |
The application can, from time to time
hang when the user click the menu very
fast with the mouse. |
|
2. |
Solved bug when editing a user login
on server installations using comma
"," as decimal point i.e. in
most
European countries. |
|
3. |
Solved bug that would prevent further
login if an Enterprise Manager attempt
to add one more login's than has been
licensed. |
|
4. |
Solved bug that allowed test questions
to be imported through XML after
testing has begun. |
|
5. |
Various bugs related to quick time
tracking and international settings. |
|
Version 3.30.00 (August
3, 2005) Available for: Server
download and hosting |
|
1. |
Project Grouping
This is a report that allows you to
group projects together independently
of which client the projects were
setup under. To read more about
Project Grouping
click here. |
|
2 |
View tasks in My Active Task page. A
small icon has been placed next to
each task listed on the page, when the
icon is clicked the task details are
displayed in a pop-up window. |
|
3 |
The software has been made module, the
major features have now become
optional. The 3f Software
Planner now comprises of numeral four
different modules. The modules
are:
Base Module (this is a requirement
for all other modules)
Gantt diagram and Planning
Approval Management
Test Management
If all four modules added, the fifth
and last module is automatically added
allowing XML files to be exported from
the system.
XML
|
|
4 |
Bug resolve: If second level time
tracking is running overnight, and the
user answers no to adjusting the
previous days stop time during log in,
time tracking could be corrupted for
that day. |
|
5 |
Various miscellaneous .bugs resolved. |
|
Version 3.20.03 (June
29, 2005) Available for: Server
download and hosting
|
|
1. |
Added XML export for test cases and
test questions. With this
feature, test cases can be exported as
XML file. During export, the
questions to include in the XML file
can be selected. |
|
2. |
Change to how task list and errors and
changes XML files are saved during
export. The XML files are now
saved locally on the client computer
as opposed to being saved on the
server computer. |
|
3. |
3f Software Planner is not available
as a hosted or non hosted solution. |
|
4. |
Various miscellaneous .bugs resolved. |
|
Version 3.10.07 (April 20, 2005)
|
|
1. |
Update
to upgrade procedure. |
|
2.
|
Bug
fixed time tracking (post entry) |
|
3. |
Resolved bug when setting top level
administrator password. |
|
4. |
Added
checking on monitor resolution color
quality upon login. |
|
5. |
Resolved bug in database manager when
changing passwords. |
|
6. |
Installation issue when installing on
a computer or server where the default
IIS user account name is changed.
|
|
Version 3.10.06 (April 13, 2005)
|
|
1. |
Potential error if Quick Time is
running past midnight resolved. |
|
2. |
Minor
installation update in conjunction
with updating from previous version
resolved. |
|
Version 3.10.05 (April 12, 2005)
|
|
1.
|
Fixed
error when timesheets do not require
approval. |
|
2. |
Fixed
error when time tracking is running
past midnight. |
|
Version 3.10.04 (April 9, 2005)
|
|
1.
|
Post
entry errors resolved. |
|
2. |
Now
includes and SQL server upgrade tool
allowing easy moving of the database
from installation server to a
Microsoft SQL server or a different
computer with MSDE installed.
|
|
3. |
Clicking Ctrl + J now opens a pane
where users can enter reports on the
fly as oppose to entering the report
at the end of the day. |
|
4. |
Updated
short cuts |
|
5. |
Added
mandatory trial version registration.
|
|
Version 3.10.03 (March 28, 2005)
|
|
1. |
Installation Issues
Installation issues that prevented 3f
Software Planner from starting on
computers with antivirus and software
firewalls has been resolved.
|
|
2. |
Task
numbers
Task
numbers for project and non project
tasks have been added.
|
|
3.
|
Color
Scheme
A new
color scheme was added to enhance the
look and feel of the 3f Software
Planner making it more like a normal
software application.
|
|
4.
|
Task
Templates
The
task list can now be exported in XML
format allowing project templates to
be created. Project templates can be
imported into new projects to shorten
the time spend when a new project is
created.
|
|
5.
|
Errors
and Changes XML Export
Errors
and Changes can now be exported in XML
format to facilitate data interchange
between different installations of 3f
Software Planner.
|
|
6.
|
Copy
task from one project to another
Tasks
can now be copied from one project to
another.
|
|
7. |
Back
Button
The
former "Up One Level" link on the
right mouse click has been
interchanged with a back button. The
back button keeps on taking you back
to the previous page.
|
|
8. |
Project
Phases are now in the Gantt diagram
The
assigning of project phases has been
moved into the task list on the Gantt
diagram.
|
|
9. |
XML Log
XML
file export is now logged similar to
login and upload/download of files.
|
|
10. |
Delete
XML Files
When
XML files are deleted in the system
the physical file is also deleted.
|
|
11. |
Improved Image handling (Print and
Email)
The
handling of images for printing and
emails has now been improved.
|
|
12. |
Bug
fixes
Various
bug fixed in the following area
-
Installation
- Gantt
diagram
- Time
tracking
- Task
list |